Working Drawings

The preparation of working drawings only begins after you are happy with the final design.

These are the final drawings prepared to meet with local Council regulations and New Zealand Building Codes, and are the blueprints your builder will refer to during construction.

A specification is prepared, as part of the working drawings, and gives greater detail of materials and workmanship required. It may also include specialist reports relating to effluent disposal, energy efficiency, truss designs, engineering details, etc.